Pool Restoration

 

This community in Coral Gables has not been able to use their community pool for 3 years due to a pool leak. The leak was caused either by the concrete surface caving in or the root system of the surrounding trees. Different methods are used in order to find the “root” cause of the leak.

During the water leak inspection, it was discovered that there was a leak from the main pool light and from the pool’s plumbing pipes. The association decided to upgrade the pool light to an automated Pentair multi color changing LED light. The pool leak detection also found a leak in the return line under the concrete pool deck. To resolve this issue, the concrete deck was cut in a section in order to access the pool’s return line. Under the concrete pool deck, it is filled with sand to accommodate the pool’s return lines. The sand acts as a support for the pool’s return lines and the concrete deck.

The pool leak led the sand to erode away slowly, this caused the concrete deck to sink in on one section of the pool deck and put extreme pressure on the return lines causing it to break. To resolve this issue, the concrete deck was cut in the section of the break to access the return lines. Furthermore, the section was refilled with sand, and the return line was reassembled with new flexible PVC pipes.

The water leaks were completely resolved. The next step was to tackle the concrete cracks inside the pool. The pool concrete surface was demolished in order to add a new layer and prepare it for the new resurfacing coat. Finally, the pool was resurfaced to a beautiful natural color Blue Quartz Diamond-Brite finish. The community was glad to have their beautiful pool back.

Restaurant Renovation

Restaurant commercial renovations require an additional level of attention. In order to provide a successful restaurant commercial renovation Percival Construction has to meet specific guidelines such as Health Code, sanitary, and fire regulations. On this project, Percival Construction was contracted to help the client meet certain design specification with a precise budget.

We worked as a team with the client in order to meet their goals and to deliver the project under the time scheduled. Furthermore, we worked with the client from the initial stage of the design phase along with the architectural team designing the project. Our expertise assisted in providing the delivery of the specific requirements for the restaurant commercial renovations such as the hood installation, grease interceptors, refrigeration, ADA upgrades and retrofits. Our knowledge and experience allowed us to identify time delays and building department approval obstacles.

Percival Construction carried on the restaurant commercial renovation and provided the following services: kitchen, restrooms, dining room, bar and lounges, exterior and an addition to the restaurant. We upgrade the concrete sidewalls and curb, in addition, to make the ramps ADA compliant. We repaired and patched roof leaks and retrofitted part of the plumbing system of the restaurant.

We provided the client with detail progress reports, suggestions, and money saving alternatives. Our goal was to provide top quality workmanship, while delivering the project on time, within budget, and without disrupting the business.

Apartment Renovation

Office Renovation

Percival Construction provided the client with innovate and cost-effective solution during the project. We provided the client with a detail scope of work in order to meet the objectives for the commercial office renovation without disturbing the business. We worked in different section as not to disturbed or disrupted the business flow. We also worked during afterhours in order to not disrupted the business work flow and to meet the client deadline.

During the initial phase of the project, Percival Construction provided experienced design consultation to make the office space more efficient and cost effective. We worked with the client’s goals and developed a specific approach to the meet the objectives. We drafted a cost estimate analysis along with a precise budget.

Percival Construction renovated the conference room, employee’s kitchen and rest area, the reception area, restrooms, the interior offices, and the main lobby. We made sure everything is up to code to meet the building department’s newest guidelines. We stayed consistent with our project schedule and deliver the project on time. With special attention to detail, Percival Construction was able to add additional office space and resolve previous deficiencies.  All building inspection were passed without a problem. Percival Construction is fortunate to have the opportunity to delivered another complete commercial office renovation project to a satisfied client.